Post

Building foundation. Used telephone pole dug 2 feet down and filled with dry cement. After placing 26 of these in the ground, 2×6’s of various lengths were laid side by side on top of poles. Thanks to Rob, Lloyed, and kim for help with this phase of project.yurt